2016 : Trailer Craft of Anchorage (Anchorage, Alaska)

This project consisted of a two-story 34,500 square-foot office, store front, warehouse, Class I Div II (16) truck bays with overhead doors, (1) wash bays, fueling stations and tanks. Coordination was done with the Local Utility to extend new power to a 600A, 480V, three-phase main electrical service, all feeders and conductors were provided as copper.

Fall 2025 : Install PEB and Wash Rack (JBER, Alaska)

This project is to construct a new heated pre‐engineered building (PEB) Wash Rack facility. Work consists of design and construction of a new concrete foundation, design and assembly of an insulated PEB, fastening the PEB to the concrete slab, installation of wash rack and all associated water, water heater, water storage, pumps/motors washing devices …

Fall 2025 : Replace UST with AST MSU (Valdez, Alaska)

Marine Safety Office: Demolition and removal of underground fuel storage tank and replacing it with a new 3,000 gallon above ground storage tank at the Marine Safety Office. Includes a new canopy with Class 1 Div II lighting and electronic tank monitoring.
Cutter Support Building: Demolition and removal of an underground storage tank that supplied fuel to the building heating system. installation of a new 480v service on the building to support a new electric boiler to heat the building.