2025 : USCG PC/FRC Homeport Phase 1 (USCG Air Station Kodiak, Alaska)
CM/GC design assist project for multiple USCG buildings including.
CM/GC design assist project for multiple USCG buildings including.
Complete renovation of an existing retail space.
Owner: Avis Rent A Car System General Contractor: Cadence General Square Footage: Completion: December 2023
Work for this project includes the demolition of the Old Fire Station 11 Building damaged in the 2018 earthquake and construction of a new PEMB (Pre-Engineered Metal Building) in Eagle River for the Municipality of Anchorage – Anchorage Fire Department.
Owner: Prince William Sound Science Center General Contractor: Dawson Construction Square Footage: Completion: December 2023
Construction of a modern 10,650 SF Christian Education Center with enclosed areas for K-12 classrooms with food service, recreational and meeting spaces.
Construction of a new church with sanctuary, classrooms, kitchen, and offices.
Owner: Matanuska Electric Association General Contractor: Criterion General Square Footage: Completion: March 2023
Owner: Orthopedic Physicians Alaska General Contractor: Howdie Inc. Square Footage: Completion: December 2022
Construct new building for Observatory as well as tie in out buildings and storage facilities with new 100’ tower for signal dishes and communications. .
CM/GC Design Assist tire, lube, and maintenance shop with EV chargers.
Imaging suite with two MRI units, a CT unit, X-Ray unit, FLRO unit, two ultrasound units. Suite also has supporting exam rooms, equipment rooms, lobbies, and offices.
New Construction of Alaska Surgery Center in Coordination with Surgery Centers of America
Install DDC System in new addition & replace existing system in current school as part of the renovation.
Assemble prefabricated metal structure with insulated metal panels. Structure to include observation mezzanine, windows to observe the ski area, arctic entries and kitchenette. Reconnect utilities.
Fire station with ten door apparatus bay, six dorm rooms, gym, training rooms, offices and training tower. Systems included APS fire alerting system, Access control, CCTV, PA, Fire Alarm, Back up power, Data, and automated door/street sign system.
3 story dental training center for ANTHC including six dental chairs, sterilization units, labs, exam rooms, training classrooms, and office space.
Owner: Alaska Native Tribal Health Consortium General Contractor: Neeser Construction, Inc. Square Footage: Completion: Winter 2020
Provide all Electrical and Special Systems for the new 3 Story Orthopedic Physicians building in Wasilla.
Owner: Orthopedic Physicians Alaska General Contractor: Howdie Inc. Square Footage: Completion: Winter 2020
Owner: Osborne Construction Co. General Contractor: Osborne Construction Co. Square Footage: Completion: Winter 2020
Construct New Health Center, to include wellness center, Paramedic Area, Dental, onsite lab and backup power provided with a 150Kw Generator. This project is only accessible via monthly barges in the winter months and has ferry access through the winter so extreme care must be taken with materials, coordination and transit.
Owner: Northern Star Resources Limited General Contractor: Pinnacle Construction Inc. Square Footage: Completion: Summer 2020
Provide all electrical and special systems for the new Wasilla Police Dept.
Remodel the Conoco Phillips Gate and Ticketing counter.
Provide all electrical for Core and Shell as well as Tenant Space for Planet fitness. Work with national vendors to provide lighting and systems.
Replace Twin 100 KW Generators Located in basement of Hospital, provide standby power during change over and coordinate mechanical to install externally mounted radiator system.
Construct new Fire Station to include, Fitness area, kitchen and dining, Dorm Rooms, Full apparatus and truck bays, training facility’s.
Provide and install a new 65KW microturbine on the roof of the Alutiiq building using a helicopter. Included new switchgear to integrate it into the building.
2 Story Medical Building Core & Shell including AK Foot and Ankle Clinic.
Remodel Warehouse and Office Space to allow for Delta West / Inlet Energy to consolidate several building into one functional space. Building includes Classified Fuel Storage as well as office and general storage space.
Owner: U.S. Air Force General Contractor: Frawner Corporation Square Footage: Completion: March 2019
Multi restaurant build out of the food court at the Ted Stevens Anchorage International Airport.
Owner: Northwestern Simon, Inc. dba Anchorage 5th Avenue Mall General Contractor: ATS Alaska Square Footage: Completion: Fall 2018
Owner: General Communications, Inc. General Contractor: Bauer Construction, Inc. Square Footage: Completion: November 2018
Owner: University of Alaska Anchorage General Contractor: Blomfield Construction Square Footage: Completion: September 2018
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: Fall 2018
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: Fall 2018
Full commercial bakery with loading docks, bakery, washroom, and offices.
Build a new Wingstop restaurant.
Remodel of the Mount Edgecumbe Hospital ER area in a fully functioning hospital. Included new Triage, Trauma, and treatment rooms and nurse station.
Owner’s design of this two level 12,300 square foot, 16 bedroom guest house for use by service members and/or their families, free of cost, while recuperating from injury or illness.
Owner: Alaska Native Tribal Health Consortium General Contractor: Cornerstone General Contractors, Inc. Square Footage: Completion: May 2018
Owner: Alaska Tribal Health Consortium General Contractor: Neeser Construction, Inc. Square Footage: Completion: May 2018
Owner: Bering Straits Native Corp General Contractor: Bauer Construction Square Footage: Completion: April 2018
Owner: Bristol Bay Area Health & ConsortiumGeneral Contractor: DarCon Construction, Inc.Square Footage: Completion: April 2018
Owner: General Contractor: F-E Contracting Square Footage: Completion:
Owner: General Contractor: Neeser Construction, Inc. Square Footage: Completion:
Owner: Entregar Alaska, LLC General Contractor: MCN Construction, Inc. Square Footage: Completion: March 2018
The Children’s Place project integrated mental health staff with OCS, Alaska State troopers, medical staff under one roof to assist children in crisis. Project consisted of security, backup power, separate data systems for different agencies, and court admissible recording systems.
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: December 2017
Owner: Orthopedic Physicians Anchorage General Contractor: Neeser Construction Inc. Square Footage: Completion: September 2017
Owner: Mat-Su Burough School District General Contractor: n/a Square Footage: Completion: September 2017
Description Here
Owner: Liquor Stores GP Inc. General Contractor: MCN Construction Square Footage: Completion: August 2017
New Show room and shop upgrades for BMW of Anchorage.
Owner: Municipality of Skagway General Contractor: Dawson Construction Square Footage: Completion: July 2017
Owner: Dr. Matthew Monaco General Contractor: Howdie Inc. Square Footage: Completion: May 2017
Description Here
Description Here
Owner: Salvation Army General Contractor: Neeser Construction, Inc. Square Footage: Completion: May 2017
Owner: Credit Union 1 General Contractor: Benchmark Construction Square Footage: Completion: April 2017
Owner: General Communications, Inc. General Contractor: Bauer Construction, Inc. Square Footage: Completion: Spring 2017
Construction of a new church
Owner: Body Renew Alaska General Contractor: Alborn Construction Square Footage: Completion: January 2017
This project consisted of a two-story 34,500 square-foot office, store front, warehouse, Class I Div II (16) truck bays with overhead doors, (1) wash bays, fueling stations and tanks. Coordination was done with the Local Utility to extend new power to a 600A, 480V, three-phase main electrical service, all feeders and conductors were provided as copper.
Owner: Alaska Native Tribal Health Consortium General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2016
Owner: General Contractor: ATS Alaska Square Footage: Completion: August 2016
Owner: Mat-Su Borough School District General Contractor: ATS Alaska Square Footage: Completion: August 2016
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2016
Owner: F-E Contracting, Inc. General Contractor: South Central Foundation Square Footage: Completion: December 2015
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2018
Owner: Anchorage School District General Contractor: F&W Construction Co., Inc. Square Footage: Completion: August 2015
Description Here
Full Remodel of Turnagain Dorm on Joint Base Elmendorf Richardson, This building was originally erected in the 1950’s and has served as an Airman dormitory since its completion. Concrete Structure of 25215 sqft
(Wellness, Education & Resource Center)
The project is a multi-function 2 story facility and contains a storage, admin, state of Alaska public health, morgue conference rooms garage and MRI.
This project will construct a new heated pre-engineered building (PEB) storage facility on JBER. Minimum building dimensions are 80’ wide x 120’ long x 24’ eave height with a gable roof at a 4/12 roof pitch.
This project is to construct a new heated pre‐engineered building (PEB) Wash Rack facility. Work consists of design and construction of a new concrete foundation, design and assembly of an insulated PEB, fastening the PEB to the concrete slab, installation of wash rack and all associated water, water heater, water storage, pumps/motors washing devices …
Marine Safety Office: Demolition and removal of underground fuel storage tank and replacing it with a new 3,000 gallon above ground storage tank at the Marine Safety Office. Includes a new canopy with Class 1 Div II lighting and electronic tank monitoring.
Cutter Support Building: Demolition and removal of an underground storage tank that supplied fuel to the building heating system. installation of a new 480v service on the building to support a new electric boiler to heat the building.
Remodel two schools in the islands of Prince William Sound. Using Small Barges, Landing Craft and Small Aircraft to deliver materials from Whittier Alaska to the smaller islands of Prince William Sound we will remodel two separate schools in the summers of 2024 & 2025
Two Story Building with approximately 1000 linear ft of new paved road and path ways. Additional work to include trunk road connector with lighting (Alaska DOT Standards)
Construct New Fire station on the Island of Kodiak, To include Full Apparatus Bay, Classroom, Gym, Crew & Sleeping areas. All materials supplied with Barge Services
Demolish roof, electrical and mechanical systems, replace existing service entrance equipment, building power and life safety systems as well as all lighting and data/fiber upgrades
This is a TI Type Project, Converting old Bank Offices to Medical Facilities with 17 Exam rooms, 1 procedure room, 1 Xray room and office support areas. It is located on the 6th floor of an existing 6 floor building
Construct new Mercedes Benz Van Center, Includes four post lifts, tire changing equipment, showroom, parts room and break/office space
Remodel of existing Dental Facility on the Island of Cordova. All materials to be delivered via barge service and or air cargo.
Medical office TI, Converting the first floor of an existing Bank to a Medical office space. It consists of 7 exam rooms, 1 procedure room and office support space. We will be separating an existing Electrical, Comm. & Fire Riser, to allow access from outside the suite.
Owner: Qayak Construction General Contractor: H. WATT & SCOTT Square Footage: 13,806 Completion: Spring 2025 Heavy Equipment Shop with Building includes, vehicle maintenance bays, heavy equipment bays, full mezzanine with parts storage and multiple office spaces.
Full TI of floors 3 thru 9
Provide & Install 300KW Backup Generator with 1200AMP Automatic Transfer Switch. MWE Oversaw all work, to include Dirt, Concrete, Electrical & Crane Operations. Providing a turn key operation, fully in house.
Remodel Tenant Space & Upgrade Fire Alarm System
GSA Contract, New construction of 3 warm storage buildings with individual services for each building.
Remodel Existing Cath Lab and general facility withing fully operational Hospital.
Supply all Electrical and Controls for Retail Facility as well as Fuel Facility Gas/Diesel/Def
Complete gut, expansion, and remodel of the old Key Bank building on 5th Ave. Project consisted of all new switchgear, back up power, fire command center, exterior LED accent lighting, new lobby and common areas, and light controls.
Supply and Install all cabling for the Direct Digital Control system for Bethel School.
Owner: Lower Kuskokwim School District General Contractor: ATS Alaska Square Footage: Completion: Fall 2021