2017 : Joe Redington High School (Wasilla, Alaska)

CM/GC Design Assist JR/SR Highschool with Vo tech style welding / wood / engine shops, auditorium, gyms, classrooms, laboratories, and illuminated football field. Project also included a fire water tower with pump controls. Equipment included a 1 Meg generator, fire alarm, security, Stage A/V system, lighting controls, PA, smartboards, and other specialty systems.

2016 : Trailer Craft of Anchorage (Anchorage, Alaska)

This project consisted of a two-story 34,500 square-foot office, store front, warehouse, Class I Div II (16) truck bays with overhead doors, (1) wash bays, fueling stations and tanks. Coordination was done with the Local Utility to extend new power to a 600A, 480V, three-phase main electrical service, all feeders and conductors were provided as copper.

2013 : FTR269B Brigade Complex (JBER, Alaska)

The Brigade Complex project is a design-build with a out-of-state contractor, Korte/Purcell JV. We are part of the design team and are working closely with both the engineers and the construction team. This is a LEEDs project that has all the expected disciplines including; service and distribution, telcom data, fire alarm, CCTV, outside Plant, testing and quality control.

2012 : Nullagvik Hotel (Kotzebue, Alaska)

New design/build 4-story wood frame construction with 75 hotel rooms. Installed complete electrical work including fire alarm system, tel/data raceway system, TV distribution system, 2000 amp building service with aluminum feeder cables, full blown kitchen area and meeting rooms with AV rough-in.

2012 : Warriors-in-Transition Complex (Ft. Richardson, Alaska)

New design/build 80-man ADA compliant barracks, battalion headquarters, company head quarters building and a solder family assistance center building. 6,713 SF Soldier Family Assistance Center, 48,989 SF ADA compliant 80PN Barracks, 8,030 SF Battalion Head Quarters, 9,020 SF Company Head Quarters, over 1 mile of fiber optic and copper plant extension, SIRPNET with holocom raceways. Installation of complete fire alarm, mass notification, area of refuge communications, data systems and SIPRNET VIA holocom raceways.

2010 : Design/Build 7 and 8 Bay F22 Shelters (Elmendorf AFB, Alaska)

This project consists of two F22 Shelters, one 7-Bay at 47,832 square feet with 14 Mega Doors and one 8-Bay at 54,344 square feet with 16 Mega Doors. We furnished complete Electrical Engineering and supplied Performance and Payment Bonds. Both shelters have full Fire Alarm Systems with Monaco transmitter and antenna to communicate to the Base Monaco receiver and complete Fire Suppression Systems.

2008 : Sockeye Inn (Anchorage, Alaska)

This project consists of a new 3-story, 18,812 square foot Boarding House/Hotel. It has a complete fire alarm, telephone/data, CCTV and door entry control systems installed. This is a first class extended stay type facility that has an appearance of salmon scales on the outside skin, quite unique for Alaska.

2007 : Aleutian Pribilof Island Association (APIA) Office Building (Anchorage, Alaska)

This project consisted of a 3-story, 39,000 square foot Class ‘A’ office building. This project included an integrated CCTV, card access, security and fire alarm systems. It has a full executive board room with a design build AV System and IFS panels were used to reduce the foot print of the switch gear and the electrical rooms allowing the customer more space for actual offices.

2007 : Hooper Bay K-12 School (Hooper Bay, Alaska)

This project consisted of a two-story 75,000 square foot K-12 School Building.  It has the latest state of the art CCTV, clock/IC/PA, security access, fire alarm, MATV and telephone/data Systems.  It has a full kitchen with walk-in cooler and freezers, a complete up to date shop area, full gymnasium, cafeteria area, back-up standby generator system and a lift station.

2007 : FAA Tower Fire Alarm Upgrades (Anchorage, Alaska)

This project consisted of a complete fire alarm upgrade with the facility under full use and was performed under conditions that had zero tolerance for shutdowns or mistakes.   Megawatt’s field foreman and project manager worked very closely with FAA representatives and the fire alarm contractor to insure that the primary goals of safety and reliability were met.

2006 : Alutiiq Center (Anchorage, Alaska)

This project consisted of a five-story 81,000 square foot class “A” office building with a 64,000 square foot two story parking garage adjacent to the office building.  It has a Full Card Access System, CCTV, MATV, Fire Alarm and Telephone/Data systems along with two state of the art Board Rooms and back-up Generator System for the Elevators.

Fall 2025 : Install PEB and Wash Rack (JBER, Alaska)

This project is to construct a new heated pre‐engineered building (PEB) Wash Rack facility. Work consists of design and construction of a new concrete foundation, design and assembly of an insulated PEB, fastening the PEB to the concrete slab, installation of wash rack and all associated water, water heater, water storage, pumps/motors washing devices …

Fall 2025 : Replace UST with AST MSU (Valdez, Alaska)

Marine Safety Office: Demolition and removal of underground fuel storage tank and replacing it with a new 3,000 gallon above ground storage tank at the Marine Safety Office. Includes a new canopy with Class 1 Div II lighting and electronic tank monitoring.
Cutter Support Building: Demolition and removal of an underground storage tank that supplied fuel to the building heating system. installation of a new 480v service on the building to support a new electric boiler to heat the building.

Spring 2023 : JBER Renovate Building 952 (JBER, Alaska)

Joint Base Elmendorf‐Richardson (JBER) is located on the northern edge of Anchorage, Alaska and is accessible from the Glenn highway at Boniface Parkway. The project location is on the Richardson side of the installation at Building 952. This project shall be accomplished as an Open Market General Construction Design Build (D-B) Project.