2025 : USCG PC/FRC Homeport Phase 1 (USCG Air Station Kodiak, Alaska)
CM/GC design assist project for multiple USCG buildings including.
CM/GC design assist project for multiple USCG buildings including.
Complete renovation of an existing retail space.
Owner: Avis Rent A Car System General Contractor: Cadence General Square Footage: Completion: December 2023
Work for this project includes the demolition of the Old Fire Station 11 Building damaged in the 2018 earthquake and construction of a new PEMB (Pre-Engineered Metal Building) in Eagle River for the Municipality of Anchorage – Anchorage Fire Department.
Owner: Prince William Sound Science Center General Contractor: Dawson Construction Square Footage: Completion: December 2023
Construction of a modern 10,650 SF Christian Education Center with enclosed areas for K-12 classrooms with food service, recreational and meeting spaces.
Construction of a new church with sanctuary, classrooms, kitchen, and offices.
Owner: Matanuska Electric Association General Contractor: Criterion General Square Footage: Completion: March 2023
Owner: Orthopedic Physicians Alaska General Contractor: Howdie Inc. Square Footage: Completion: December 2022
Construct new building for Observatory as well as tie in out buildings and storage facilities with new 100’ tower for signal dishes and communications. .
CM/GC Design Assist tire, lube, and maintenance shop with EV chargers.
Imaging suite with two MRI units, a CT unit, X-Ray unit, FLRO unit, two ultrasound units. Suite also has supporting exam rooms, equipment rooms, lobbies, and offices.
New Construction of Alaska Surgery Center in Coordination with Surgery Centers of America
Install DDC System in new addition & replace existing system in current school as part of the renovation.
Assemble prefabricated metal structure with insulated metal panels. Structure to include observation mezzanine, windows to observe the ski area, arctic entries and kitchenette. Reconnect utilities.
Fire station with ten door apparatus bay, six dorm rooms, gym, training rooms, offices and training tower. Systems included APS fire alerting system, Access control, CCTV, PA, Fire Alarm, Back up power, Data, and automated door/street sign system.
This project involves remodeling of 5 areas within Hangar 1 (Building 14) to accommodate the functions associated with the new C130J aircraft.
3 story dental training center for ANTHC including six dental chairs, sterilization units, labs, exam rooms, training classrooms, and office space.
This project is to recommission, reconfigure, and renovate the existing, but unoccupied, former senior center (approximately 7,690sf) in Bethel, Alaska into a safe and code compliant homeless shelter.
Owner: Alaska Native Tribal Health Consortium General Contractor: Neeser Construction, Inc. Square Footage: Completion: Winter 2020
Provide all Electrical and Special Systems for the new 3 Story Orthopedic Physicians building in Wasilla.
Owner: Orthopedic Physicians Alaska General Contractor: Howdie Inc. Square Footage: Completion: Winter 2020
Owner: Osborne Construction Co. General Contractor: Osborne Construction Co. Square Footage: Completion: Winter 2020
Construct New Health Center, to include wellness center, Paramedic Area, Dental, onsite lab and backup power provided with a 150Kw Generator. This project is only accessible via monthly barges in the winter months and has ferry access through the winter so extreme care must be taken with materials, coordination and transit.
Owner: Northern Star Resources Limited General Contractor: Pinnacle Construction Inc. Square Footage: Completion: Summer 2020
Provide all electrical and special systems for the new Wasilla Police Dept.
Remodel the Conoco Phillips Gate and Ticketing counter.
Provide all electrical for Core and Shell as well as Tenant Space for Planet fitness. Work with national vendors to provide lighting and systems.
Replace Twin 100 KW Generators Located in basement of Hospital, provide standby power during change over and coordinate mechanical to install externally mounted radiator system.
Construct new Fire Station to include, Fitness area, kitchen and dining, Dorm Rooms, Full apparatus and truck bays, training facility’s.
Provide and install a new 65KW microturbine on the roof of the Alutiiq building using a helicopter. Included new switchgear to integrate it into the building.
2 Story Medical Building Core & Shell including AK Foot and Ankle Clinic.
Remodel Warehouse and Office Space to allow for Delta West / Inlet Energy to consolidate several building into one functional space. Building includes Classified Fuel Storage as well as office and general storage space.
Owner: U.S. Air Force General Contractor: Frawner Corporation Square Footage: Completion: March 2019
Multi restaurant build out of the food court at the Ted Stevens Anchorage International Airport.
Owner: Northwestern Simon, Inc. dba Anchorage 5th Avenue Mall General Contractor: ATS Alaska Square Footage: Completion: Fall 2018
Owner: General Communications, Inc. General Contractor: Bauer Construction, Inc. Square Footage: Completion: November 2018
Owner: University of Alaska Anchorage General Contractor: Blomfield Construction Square Footage: Completion: September 2018
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: Fall 2018
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: Fall 2018
Full commercial bakery with loading docks, bakery, washroom, and offices.
Build a new Wingstop restaurant.
Remodel of the Mount Edgecumbe Hospital ER area in a fully functioning hospital. Included new Triage, Trauma, and treatment rooms and nurse station.
Owner’s design of this two level 12,300 square foot, 16 bedroom guest house for use by service members and/or their families, free of cost, while recuperating from injury or illness.
Owner: Alaska Native Tribal Health Consortium General Contractor: Cornerstone General Contractors, Inc. Square Footage: Completion: May 2018
Owner: Alaska Tribal Health Consortium General Contractor: Neeser Construction, Inc. Square Footage: Completion: May 2018
Owner: Bering Straits Native Corp General Contractor: Bauer Construction Square Footage: Completion: April 2018
Owner: Bristol Bay Area Health & ConsortiumGeneral Contractor: DarCon Construction, Inc.Square Footage: Completion: April 2018
Owner: General Contractor: F-E Contracting Square Footage: Completion:
Owner: General Contractor: Neeser Construction, Inc. Square Footage: Completion:
Owner: Entregar Alaska, LLC General Contractor: MCN Construction, Inc. Square Footage: Completion: March 2018
The Children’s Place project integrated mental health staff with OCS, Alaska State troopers, medical staff under one roof to assist children in crisis. Project consisted of security, backup power, separate data systems for different agencies, and court admissible recording systems.
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: December 2017
Owner: Orthopedic Physicians Anchorage General Contractor: Neeser Construction Inc. Square Footage: Completion: September 2017
Owner: Mat-Su Burough School District General Contractor: n/a Square Footage: Completion: September 2017
Description Here
Owner: Liquor Stores GP Inc. General Contractor: MCN Construction Square Footage: Completion: August 2017
New Show room and shop upgrades for BMW of Anchorage.
Owner: Municipality of Skagway General Contractor: Dawson Construction Square Footage: Completion: July 2017
CM/GC Design Assist JR/SR Highschool with Vo tech style welding / wood / engine shops, auditorium, gyms, classrooms, laboratories, and illuminated football field. Project also included a fire water tower with pump controls. Equipment included a 1 Meg generator, fire alarm, security, Stage A/V system, lighting controls, PA, smartboards, and other specialty systems.
Owner: Dr. Matthew Monaco General Contractor: Howdie Inc. Square Footage: Completion: May 2017
Description Here
Description Here
Owner: Salvation Army General Contractor: Neeser Construction, Inc. Square Footage: Completion: May 2017
Owner: Credit Union 1 General Contractor: Benchmark Construction Square Footage: Completion: April 2017
Owner: General Communications, Inc. General Contractor: Bauer Construction, Inc. Square Footage: Completion: Spring 2017
Construction of a new church
Owner: Body Renew Alaska General Contractor: Alborn Construction Square Footage: Completion: January 2017
This project consisted of a two-story 34,500 square-foot office, store front, warehouse, Class I Div II (16) truck bays with overhead doors, (1) wash bays, fueling stations and tanks. Coordination was done with the Local Utility to extend new power to a 600A, 480V, three-phase main electrical service, all feeders and conductors were provided as copper.
Owner: Alaska Native Tribal Health Consortium General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2016
Owner: General Contractor: ATS Alaska Square Footage: Completion: August 2016
Owner: Mat-Su Borough School District General Contractor: ATS Alaska Square Footage: Completion: August 2016
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2016
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2016
Owner: City of Nome General Contractor: ASRC SKW Square Footage: Completion: June 2016
We are providing the complete wiring for an enclosed water park. It will include pool pumps, wave pool, lazy river, water slide, wading area, and chemical machines. There are many pieces of exercise equipment, a free weight area, and a full size gymnasium. The special systems include a fire alarm system, public address system, and phone/data.
Owner: F-E Contracting, Inc. General Contractor: South Central Foundation Square Footage: Completion: December 2015
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2018
Owner: Orthopedic Physicians Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2015
This is a remodel of existing fire station 4 on Elmendorf AFB. There are two additions, front, and back. We are installing new lighting, phone/data, fire alarm, and power.
Owner: Anchorage School District General Contractor: F&W Construction Co., Inc. Square Footage: Completion: August 2015
Owner: Lower Yukon School District General Contractor: Dokoozain Construction LLC Square Footage: Completion: July 2015
Description Here
Owner: University of Alaska Anchorage General Contractor: Neeser Construction, Inc. Square Footage: Completion: July 2015
Owner: Body Renew General Contractor: PCG General Contracting, LLC Square Footage: Completion: April 2015
Owner: Lower Yukon School District General Contractor: Dokoozain Construction LLC Square Footage: Completion: March 2015
Owner: City of Valdez General Contractor: Dawson Construction Square Footage: Completion: November 2014
Owner: Lower Yukon School District General Contractor: Dowland Construction, Inc. Square Footage: 53,000 Completion: October 2014
Owner: PMAC General Contractor: MCN Construction, Inc. Square Footage: Completion: October 2014
Owner: Lower Yukon School District Square Footage: Completion: August 2014
Complete Media Center with TV Studio, control rooms, 69 rack server room, UPS, backup generator, conference rooms, and offices.
Owner: Litiha Dodge General Contractor: MCN Construction, Inc. Square Footage: Completion: July 2014
Owner: Alaska Native Medical Center General Contractor: Neeser Construction, Inc. Square Footage: Completion: June 2014
Owner: Barrow Street LLC General Contractor: Neeser Construction, Inc. Square Footage: 44,988 Completion: March 2014
This project is a design/assist project to renovate existing office and warehouse space into a television studio. The design will require MWE to furnish and install a new 350kVA generator, 800A transfer switch, transformers, panel boards, branch circuitry, lighting, card access, and a pre-action fire alarm system.
Owner: Continental Auto Group General Contractor: MCN Construction, Inc. Completion: September 2013
Copper River Native Association- Robert Marshall Building – Community Health & Wellness Center
Tazlina new design/build health clinic with 8 dental chairs, mental health, primary care, x-ray, and other clinic functions.
The Brigade Complex project is a design-build with a out-of-state contractor, Korte/Purcell JV. We are part of the design team and are working closely with both the engineers and the construction team. This is a LEEDs project that has all the expected disciplines including; service and distribution, telcom data, fire alarm, CCTV, outside Plant, testing and quality control.
Owner: Alaska Air National Guard General Contractor: Iyabak Construction LLC Square Footage: Completion: March 2013
Owner: General Communications, Inc. General Contractor: Lake View General Contracting Square Footage: 8,500 Completion: December 2012
Emergency Generator Upgrade
Construction of a new Court Yard
Owner: Walgreens General Contractor: MCN Construction, Inc. Square Footage: Completion: October 2012
Various energy efficiency improvements.
Owner: South Central Foundation General Contractor: Neeser Construction, Inc. Square Footage: Completion: September 2012
New design/assist 84,200 SF state of the art crime detection laboratory building in Anchorage, Alaska. Worked hand-in-hand with the owner and their team. Complete electrical including eight security access controls, CCTV, duress systems and 750 KVA emergency standby and UPS system.
Restaurant in Terminal C of the Airport
New design/build 4-story wood frame construction with 75 hotel rooms. Installed complete electrical work including fire alarm system, tel/data raceway system, TV distribution system, 2000 amp building service with aluminum feeder cables, full blown kitchen area and meeting rooms with AV rough-in.
New design/build 80-man ADA compliant barracks, battalion headquarters, company head quarters building and a solder family assistance center building. 6,713 SF Soldier Family Assistance Center, 48,989 SF ADA compliant 80PN Barracks, 8,030 SF Battalion Head Quarters, 9,020 SF Company Head Quarters, over 1 mile of fiber optic and copper plant extension, SIRPNET with holocom raceways. Installation of complete fire alarm, mass notification, area of refuge communications, data systems and SIPRNET VIA holocom raceways.
Installation of lighting upgrades to the main auditorium and lobby areas.
Owner: Lower Yukon School District General Contractor: Neeser Construction, Inc. Square Footage: 32,577 Completion: December 2011
Tenant improvements to 48 unit project to serve chronic homeless alcoholics. Improvements to include the addition of an elevator, mechanical upgrades, new CCTV & intercom systems as well as upgrades to the existing fire alarm system.
Owner: Fisher House Foundation, Inc. General Contractor: Neeser Construction, Inc. Completion: December 2011
Installation of new AV systems to include whiteboards & video conferencing to their new VA Facility in East Anchorage.
Sports Bar theme restaurant in the new Tikahtnu Commons Mall.
Addition of a digital shooting range to an existing building.
Distribution, power & lighting, voice/data networking, fire alarm systems
Various Smaller Projects
New construction of the Salvation Army Community Center
Owner: Bristol Bay Area Health Corporation General Contractor: Dar-Con Corporation, Inc. Completion: March 2011
Furnish and install standby generator sets and automatic power transfer switches at West Lakes PSB’s 81 & 72 and Palmer ambulance PSB 39.
Owner: Browman Development General Contractor: F-E Contracting, Inc. Completion: December 2010
Supply and installation of hate electrical work including service and distribution lights, fire alarm, phone and data, weapons vault security system.
Installation of conduit, wire boxes and control devices for a new heating and ventilation controls system.
This project was a total remodel of the Valley Hospital into the Palmer State Office Building. The unique aspect of this project was that it consisted of keeping the tenants in the building operational with no break in service during the complete re-model.
Complete remodel and upgrades to existing building. New fire alarm system for remodeled portion of the building tied into the existing fire alarm system. Installed new lighting, power and telephone/data systems. Installed new vindicator security system for weapons vault.
This project consists of two F22 Shelters, one 7-Bay at 47,832 square feet with 14 Mega Doors and one 8-Bay at 54,344 square feet with 16 Mega Doors. We furnished complete Electrical Engineering and supplied Performance and Payment Bonds. Both shelters have full Fire Alarm Systems with Monaco transmitter and antenna to communicate to the Base Monaco receiver and complete Fire Suppression Systems.
Complete security card access system.
Provide and install all power, lighting, voice/data and security for a complete operating system for the new Credit Union 1, Mtn View Branch.
Supply and installation of the electrical work including transformer upgrades, lighting, fire alarm, phone and data.
Owner: U.S. Air Force General Contractor: McGee Industries Completion: June 2010
This project consists of a 75,000square foot three-story medical office building with ties to the new three-story parking garage and the existing PCC II office building. It has the latest state of the art security, fire alarm, telephone/data and nurse call systems. It utilizes the latest LED fixtures for the display cases and corridor lighting.
Executive airplane hangars and office space.
Owner: University of Alaska, Anchorage General Contractor: SR Bales Construction Completion: December 2009
This project consists of remodeling a three-storie above ground dormitory and full basement underground with support offices. It has full Fire Alarm, Mass Notification and Telephone/Data Systems. It includes a complete new Service and Primary Distribution Systems with added Site Lighting.
Owner: Coastal Village Seafoods Region General Contractor: Coastal Village Seafoods Region Completion: November 2009
This project consists of furnishing and installing 35 street light poles. They have state of the art LED fixtures from BETA Company. The poles are located throughout 6 city streets in Palmer AK. Two 100 amp, fully enclosed load centers are included to power the new lighting. HDPE and Rigid conduit was used with #8 and #6 illumination cables for the wiring.
This project consists of a new 8,151 square foot block warehouse building for engine parts storage.
Owner: Cook Inlet Housing Authority General Contractor: Neeser Construction, Inc. Square Footage: Completion: October 2009
This project consists of remodeling two existing Hangers and wiring for a new foam fire suppression systems pump room building. Includes re-wiring the existing high voltage primary system, installing new transformers and building services, and complete removal of the existing light fixtures and installing new HID lighting.
This project consists of a two-story 32,577 square foot K-12 School Building. It has the latest state of the art clock/IC/PA, security, fire alarm, MATV, telephone/data cabling systems, standby generator, kitchen, shop, cafeteria and gymnasium areas.
Owner: City of Eagle River General Contractor: Watterson Construction, Inc. Completion: September 2009
This project consists of a two-story office included within a 40,000 square foot warehouse/office type building. It has several Rail Cranes, Welders and other misc. equipment per the Tenant’s layout.
This project consists of a complete remodel of the existing 41,171 square foot railroad Historic Freight Shed into a modern state of the art space for future Offices, Retail Store, Restaurant, Entertainment and Tourism areas.
This project consists of a one-story block Dialysis Clinic building. It has a full building standby backup generation system installed so none of the crucial dialysis equipment would fail in the event of a loss of power.
This project consists of two buildings comprising a 15,000 square foot Processing Plant complete with wiring of all automatic control systems and a 5,200 square foot maintenance building with complete wiring of power, lights, fire alarm, telephone/data cabling, heat trace, disconnects and starters for the processing equipment.
Renovation of existing building into new state of the art Dialysis Center. fire alarm, nurse call, security and tel/data and sub-metering systems with back up power were installed for this project.
This project consists of a three-story 212,260 square foot Class “A” Convention Facility. It has a 50,000 square foot exhibit hall, 25,000 square foot ballrooms and meeting rooms with complete dimming system, huge lobby area and full scale kitchen area with walk-in coolers/freezers.
This project consists of a new 3-story, 18,812 square foot Boarding House/Hotel. It has a complete fire alarm, telephone/data, CCTV and door entry control systems installed. This is a first class extended stay type facility that has an appearance of salmon scales on the outside skin, quite unique for Alaska.
This project consisted of a three story 172,500 square foot parking garage with a sky bridge connecting the Primary Care Center Phase III medical office building on the second floor. It has an elevator capture fire alarm system and lobby cardkey System.
This project consisted of a three-story 62,253 square foot Medical Building with various tenants. It has a card access door system, fire alarm and telephone/data systems.
This project consisted of a three story 581,000 square foot parking garage with a rental car lobby, twelve car washes, vacuum systems, fueling stations, canopy and tanks. It has a CCTV camera security system, duress phone system and complete fire alarm system.
This project consisted of a 3-story, 39,000 square foot Class ‘A’ office building. This project included an integrated CCTV, card access, security and fire alarm systems. It has a full executive board room with a design build AV System and IFS panels were used to reduce the foot print of the switch gear and the electrical rooms allowing the customer more space for actual offices.
This project consisted of a 20,720 square foot McKinnell Housing Unit with full kitchen and cafeteria areas, management offices and a 5,724 square foot Cares for Kids Crisis Center with a complete lighted parking lot area.
This project consisted of a two-story 40,000 square foot K-12 School Building. It has the latest state of the art clock/IC/PA, security access, fire alarm, MATV, telephone/data cabling systems, kitchen, shop, gymnasium and cafeteria Areas.
This project consisted of a two-story 75,000 square foot K-12 School Building. It has the latest state of the art CCTV, clock/IC/PA, security access, fire alarm, MATV and telephone/data Systems. It has a full kitchen with walk-in cooler and freezers, a complete up to date shop area, full gymnasium, cafeteria area, back-up standby generator system and a lift station.
This project consisted of a complete fire alarm upgrade with the facility under full use and was performed under conditions that had zero tolerance for shutdowns or mistakes. Megawatt’s field foreman and project manager worked very closely with FAA representatives and the fire alarm contractor to insure that the primary goals of safety and reliability were met.
This project consisted of a five-story 81,000 square foot class “A” office building with a 64,000 square foot two story parking garage adjacent to the office building. It has a Full Card Access System, CCTV, MATV, Fire Alarm and Telephone/Data systems along with two state of the art Board Rooms and back-up Generator System for the Elevators.
These projects were a few of Megawatt’s very first projects when we were starting up our business in the fall of 2004. Our complete fleet of vehicles included one service van and one pickup truck with two electricians on our payroll.
This is a new 1-story Medical Dialysis Clinic consisting of 20,000 square foot furred out block building. The project broke ground in September 2004 and completely enclosed and heated by February 2005. It was completed and turned over to the owner on May 30, 2005.
Full Remodel of Turnagain Dorm on Joint Base Elmendorf Richardson, This building was originally erected in the 1950’s and has served as an Airman dormitory since its completion. Concrete Structure of 25215 sqft
(Wellness, Education & Resource Center)
The project is a multi-function 2 story facility and contains a storage, admin, state of Alaska public health, morgue conference rooms garage and MRI.
This project will construct a new heated pre-engineered building (PEB) storage facility on JBER. Minimum building dimensions are 80’ wide x 120’ long x 24’ eave height with a gable roof at a 4/12 roof pitch.
This project is to construct a new heated pre‐engineered building (PEB) Wash Rack facility. Work consists of design and construction of a new concrete foundation, design and assembly of an insulated PEB, fastening the PEB to the concrete slab, installation of wash rack and all associated water, water heater, water storage, pumps/motors washing devices …
Marine Safety Office: Demolition and removal of underground fuel storage tank and replacing it with a new 3,000 gallon above ground storage tank at the Marine Safety Office. Includes a new canopy with Class 1 Div II lighting and electronic tank monitoring.
Cutter Support Building: Demolition and removal of an underground storage tank that supplied fuel to the building heating system. installation of a new 480v service on the building to support a new electric boiler to heat the building.
Remodel two schools in the islands of Prince William Sound. Using Small Barges, Landing Craft and Small Aircraft to deliver materials from Whittier Alaska to the smaller islands of Prince William Sound we will remodel two separate schools in the summers of 2024 & 2025
Two Story Building with approximately 1000 linear ft of new paved road and path ways. Additional work to include trunk road connector with lighting (Alaska DOT Standards)
Construct New Fire station on the Island of Kodiak, To include Full Apparatus Bay, Classroom, Gym, Crew & Sleeping areas. All materials supplied with Barge Services
Demolish roof, electrical and mechanical systems, replace existing service entrance equipment, building power and life safety systems as well as all lighting and data/fiber upgrades
This is a TI Type Project, Converting old Bank Offices to Medical Facilities with 17 Exam rooms, 1 procedure room, 1 Xray room and office support areas. It is located on the 6th floor of an existing 6 floor building
Construct new Mercedes Benz Van Center, Includes four post lifts, tire changing equipment, showroom, parts room and break/office space
Remodel of existing Dental Facility on the Island of Cordova. All materials to be delivered via barge service and or air cargo.
Medical office TI, Converting the first floor of an existing Bank to a Medical office space. It consists of 7 exam rooms, 1 procedure room and office support space. We will be separating an existing Electrical, Comm. & Fire Riser, to allow access from outside the suite.
Owner: Qayak Construction General Contractor: H. WATT & SCOTT Square Footage: 13,806 Completion: Spring 2025 Heavy Equipment Shop with Building includes, vehicle maintenance bays, heavy equipment bays, full mezzanine with parts storage and multiple office spaces.
Full TI of floors 3 thru 9
Provide & Install 300KW Backup Generator with 1200AMP Automatic Transfer Switch. MWE Oversaw all work, to include Dirt, Concrete, Electrical & Crane Operations. Providing a turn key operation, fully in house.
Remodel Tenant Space & Upgrade Fire Alarm System
GSA Contract, New construction of 3 warm storage buildings with individual services for each building.
Remodel Existing Cath Lab and general facility withing fully operational Hospital.
Supply all Electrical and Controls for Retail Facility as well as Fuel Facility Gas/Diesel/Def
Complete gut, expansion, and remodel of the old Key Bank building on 5th Ave. Project consisted of all new switchgear, back up power, fire command center, exterior LED accent lighting, new lobby and common areas, and light controls.
Supply and Install all cabling for the Direct Digital Control system for Bethel School.
Joint Base Elmendorf‐Richardson (JBER) is located on the northern edge of Anchorage, Alaska and is accessible from the Glenn highway at Boniface Parkway. The project location is on the Richardson side of the installation at Building 952. This project shall be accomplished as an Open Market General Construction Design Build (D-B) Project.
Owner: Lower Kuskokwim School District General Contractor: ATS Alaska Square Footage: Completion: Fall 2021