Fall 2025 : Install PEB and Wash Rack (JBER, Alaska)

This project is to construct a new heated pre‐engineered building (PEB) Wash Rack facility. Work consists of design and construction of a new concrete foundation, design and assembly of an insulated PEB, fastening the PEB to the concrete slab, installation of wash rack and all associated water, water heater, water storage, pumps/motors washing devices …

Fall 2025 : Replace UST with AST MSU (Valdez, Alaska)

Marine Safety Office: Demolition and removal of underground fuel storage tank and replacing it with a new 3,000 gallon above ground storage tank at the Marine Safety Office. Includes a new canopy with Class 1 Div II lighting and electronic tank monitoring.
Cutter Support Building: Demolition and removal of an underground storage tank that supplied fuel to the building heating system. installation of a new 480v service on the building to support a new electric boiler to heat the building.

Spring 2023 : JBER Renovate Building 952 (JBER, Alaska)

Joint Base Elmendorf‐Richardson (JBER) is located on the northern edge of Anchorage, Alaska and is accessible from the Glenn highway at Boniface Parkway. The project location is on the Richardson side of the installation at Building 952. This project shall be accomplished as an Open Market General Construction Design Build (D-B) Project.